In the aftermath of the Urda train crash here in Spain with 69 deaths at the time of recording, we spoke with Railway Engineer and writer Gareth Dennis on LZB…
Gareth DennisGuestPodcast HostHost
It was developed around the fact that Germany needed greater capacity, greater speeds on its existing railway lines.

But in doing so, it was coming to a situation where line-side signals, so that lights on sticks, traffic lights, a bit like we have when we're driving in our cars, those traffic lights become difficult to read over speeds of around 200 kilometers an hour.

In Britain, we were having similar challenges as we were developing faster trains, high-tech trains.

Now, how the system works is there are control centers set up at around about 30 to 40 kilometers spacings.

And those control centers take information from the track that is picked up where the train is, what the position of the train is, speeds of the train.

And within that control center is programmed in information like gradients, curvature, junctions, and the expected performance of the trains operating that allows that system to pretty accurately create a safe operating kind of block, if you like, that the train can operate within.

Basically, it creates a small enough gap within that railway that the train can run that you can actually run lots of trains in quick succession, get a really nice high-capacity railway, and one that is absolutely safe.


But the issue with any signaling system, particularly those developed actually in the era of early, or let's say the nascent period of commercial electronics, is that obsolescence becomes a problem very quickly.

It was developed around the fact that Germany needed greater capacity, greater speeds on its existing railway lines.

But in doing so, it was coming to a situation where line-side signals, so that lights on sticks, traffic lights, a bit like we have when we're driving in our cars, those traffic lights become difficult to read over speeds of around 200 kilometers an hour.

In Britain, we were having similar challenges as we were developing faster trains, high-tech trains.

Now, how the system works is there are control centers set up at around about 30 to 40 kilometers spacings.

And those control centers take information from the track that is picked up where the train is, what the position of the train is, speeds of the train.

And within that control center is programmed in information like gradients, curvature, junctions, and the expected performance of the trains operating that allows that system to pretty accurately create a safe operating kind of block, if you like, that the train can operate within.

Basically, it creates a small enough gap within that railway that the train can run that you can actually run lots of trains in quick succession, get a really nice high-capacity railway, and one that is absolutely safe.


But the issue with any signaling system, particularly those developed actually in the era of early, or let's say the nascent period of commercial electronics, is that obsolescence becomes a problem very quickly.
The rest of this transcript — segmented and speaker-labeled, so you land on the exact moment something was said
Search every transcript — by keyword, by phrase, or by meaning, across every show Radar indexes
Trends — what is surging across podcasts, measured against its own baseline
Alerts — when a name you follow appears in a newly indexed episode
No account is needed to search Radar.