European Train Control System
36
MENTIONS
8
EPISODES
4
PODCASTS
Search complete. 36 mentions across 8 episodes found for "European Train Control System".
Nov 4, 2026
This is how NOT to brand Britain's trains | #Railnatter 328
G
6:34Gareth DennisHOST
We have to talk about obsolescence, safety, and safe systems.
G
6:37Gareth DennisHOST
Within this section, I've been asked a lot of questions around having analyzed the sequence of events, what's my view on failings in the safety systems that led to the tragedy? How does LZB system, that signaling system, work in practice? What are the procedures if that system fails? How does that system differ from modern ETCS, European Train Control System? What are the main technical differences in speed monitoring, braking supervision, operational safety? How does LZB compare with other train protections in signaling systems used across Europe? And how do I view the fact that the LZB system has crashed 170 times this year? These are some of the questions I've been thrown, and then I'm gonna pick off a few elements of that.
G
7:13Gareth DennisHOST
as we push forwards.
G
7:14Gareth DennisHOST
So there is a big difference.
G
9:02Gareth DennisHOST
that you can do that, you can make that movement.
G
9:05Gareth DennisHOST
So it gives you a position basically, a block, if you like, within which that train can sit.
G
9:11Gareth DennisHOST
This is basically similar to ETCS, right? The difference really between LZB and ETCS is that The communication with LZB is done through line side cabling, primarily, whereas, and also that the calculations are done at the control center with the system, you know, the track information, the vehicle performance, the timetable, all these things, junction positions, all programmed in to the control center.
G
9:33Gareth DennisHOST
Whereas with ETCS, a lot of the calculations are done within the trains onboard computer and the communication is done via GSMR.
We visit a massive German Train Factory – Alstom’s Hennigsdorf facility near Berlin
R
10:50Richard BowkerHOST
for Hamburg.
R
10:50Richard BowkerHOST
This has been fitted with Grade 2 automatic train operation, so Grade 2 ATO over ETCS, which means that the train itself has more automated operations than just a standard train fitted with ETCS.
R
11:07Richard BowkerHOST
This train is fitted with Grade 2 or GOA 2 ATO automatic train operation over ETCS level 2.
R
11:15Richard BowkerHOST
Now that's a semi-automatic train operation standard where the train accelerates, coasts and brakes automatically.
R
11:22Richard BowkerHOST
whilst the driver remains in the cab for supervision and intervention if required.
What Do We Know About The Urda Rail Crash? | #Railnatter 327
G
34:49Gareth DennisHOST
It's in the process of being replaced by the end of this decade.
G
34:52Gareth DennisHOST
by European Train Control System, by ETCS.
G
34:55Gareth DennisHOST
It is referenced by the European Union Agency for Railways, the ERA, the European Railway Agency, as a Class B train protection system, which means basically like it's not quite at the level of providing the full protection that ETCS does.
G
35:11Gareth DennisHOST
And so hence why it's needed to be replaced if it's the isolated system.
G
35:16Gareth DennisHOST
But of course, high-speed trains don't get scrapped as soon as you take them off the main line.
G
35:43Gareth DennisHOST
In terms of the signaling on this line, this is an article in the International Railway Journal from December 2021, when this train was, when this rail line was theoretically starting the process of having its LZB replaced.
G
36:02Gareth DennisHOST
So Thales were awarded the contract, or two contracts, specifically by ADIF, the network rail equivalent in Spain.
G
36:10Gareth DennisHOST
The first contract was an 80 million euro contract that was supposed to replace LZB with level 2 ETCS, as well as replace interlockings and update all sorts of stuff, renewal of copper networks that were there to detect fallen objects on the track.
Siemens Mobility – The company building London’s new Tube Trains!
A
13:55Aglaya SchneiderGUEST
So that's a great example of what we can do with existing stock and really making it look and feel brand new.
A
14:05Aglaya SchneiderGUEST
We have also obviously deployed and tested our ETCS solution on Thameslink, running through the core, really being able on running on the same infrastructure, more trains just with digital signalling solutions.
A
14:20Aglaya SchneiderGUEST
So I believe there's one point of getting more new rolling stock into the system and into the market, which is extremely important.
A
14:28Aglaya SchneiderGUEST
But there's many other points of things we can do and technology we can offer to do more with what we already have.
Labour have CANCELLED Bradford's new station | #Railnatter 326
G
47:45Gareth DennisHOST
There's a preliminary examination that the Rail Action Investigation Branch have picked up from the Rail Industry because they see it as important.
G
47:52Gareth DennisHOST
There has been an ETCS wrong side failure in Wales.
G
47:55Gareth DennisHOST
That means a failure that could result, you know, that is not, you know, the signal is broken and it goes to green or it goes off, which is assumed as red.
G
48:03Gareth DennisHOST
Sorry, signal's broken, it goes to red as a right-side failure, or it goes off and you assume it's red.
G
48:08Gareth DennisHOST
No, that's something saying green when it should be red, or the ETCS equivalent on the driver's VDU, visual display unit.
G
48:16Gareth DennisHOST
And that's what happened.
G
48:17Gareth DennisHOST
The train was beckoned forwards beyond its actual safe position of operation.
G
48:31Gareth DennisHOST
Basically, a series of different systems, all with conflicting information about precisely where the train was.
Railway Patch Management: Connecting Cybersecurity and RAMS | CUP Focus
S
0:24speaker_0HOST
200 milliseconds is a minor, completely unnoticeable lag on a Zoom call or, you know, loading a cloud application.
S
0:30speaker_1HOST
But in the European train control system...
S
0:32speaker_0HOST
In ETCS, timing is literally life or death.
S
0:36speaker_0HOST
The system relies on continuous real-time communication between the train and the radio block center.
S
0:41speaker_1HOST
Ah, I see.
S
0:42speaker_0HOST
If that new inline firewall delays an ETCS packet by 200 milliseconds, the train's onboard computer registers a loss of continuous communication with the track.
S
0:50speaker_1HOST
And let me guess, the train doesn't just buffer and wait for the connection to reestablish.
S
0:55speaker_0HOST
No.
157. Are trains now to be owned by the Government? New Rolling Stock Strategy suggests they might
R
7:36Richard BowkerHOST
Anybody who thinks that outcome-based procurement means you can have a three-page spec, not a 50-page spec, has never bought anything, right? So it is, it is quite a complex thing.
R
7:48Richard BowkerHOST
Uh, it talks about ETCS.
R
7:50Richard BowkerHOST
Everything's gonna come ETCS around, ready.
R
7:52Richard BowkerHOST
Well, which baseline? I, I, I'm not sure what baseline we're on now, and every time we ...
R
7:57Richard BowkerHOST
a new baseline comes out, there's massive retro costs to the stuff that's already fitted to get it up to the new baseline.
Intuitive Insights Podcast | Season 2 Episode 6: Rob Mullen
N
20:30Nina LockwoodHOST
Mm.
R
20:30Rob MullenGUEST
So, um, you know, and there were lots of exciting things to do, ETCS through the, the central core, but the fundamental issues were around performance and trade, uh, trade union agreements on, uh, up on, you know, GN and, and Thameslink and-
N
20:46Nina LockwoodHOST
Mm
R
20:46Rob MullenGUEST
...
23 MINS LATER
R
43:27Rob MullenGUEST
I think the second part of that is, is it is a inherent responsibility on us to make sure that growth is, is included within that priority list.
N
43:36Nina LockwoodHOST
Mm-hmm.
R
43:36Rob MullenGUEST
Because we know on the railway infrastructure change, infrastructure delivery, uh, whether that's rolling stock or whether that's, you know, building, uh, you know, a new track or ETCS or any of those types of things, takes a long time.
R
43:52Rob MullenGUEST
New signaling schemes take a long time.