Building Strong Homes: Blueprints to Strengthen Your Faith and Family podcast
Sep 22, 2026 · 8 min · 8 segments
In this first Kitchen Table episode of the fall season, we ask a question that reframes how we look at every closed door and hard season: what if the obstacle isn't blocking your dream — what if it…
Carol RoperHost
I didn't have it in me to face another day, much less weeks, months, and possibly years of walking into that office.

I'd been excited to get a part-time job at an architectural firm while still in college.

even though the first few months there were intimidating i looked forward to the assignments i worked on each day after graduating with my degree in architectural engineering i was hired full time everything seemed to be falling into place But the job wasn't all creativity and house plans, as I'd hoped.

I was able to work on some gorgeous homes, but most days I plotted away drawing commercial buildings.

That wasn't too bad until our firm landed the contract to design or remodel Bilo grocery stores.

Suddenly, I was spending every day drawing rows of shelving, coolers, and video rental counters.

Almost every store had virtually the same plan, just scaled to a different square footage, so I was basically copying the same thing over and over again.

After I'd been there about three years, Bilo Headquarters asked our firm to provide a draftsman to work at its corporate office for a few months.

Now, I spent every working hour in a dark, windowless room exclusively drawing grocery stores.

I didn't have it in me to face another day, much less weeks, months, and possibly years of walking into that office.

I'd been excited to get a part-time job at an architectural firm while still in college.

even though the first few months there were intimidating i looked forward to the assignments i worked on each day after graduating with my degree in architectural engineering i was hired full time everything seemed to be falling into place But the job wasn't all creativity and house plans, as I'd hoped.

I was able to work on some gorgeous homes, but most days I plotted away drawing commercial buildings.

That wasn't too bad until our firm landed the contract to design or remodel Bilo grocery stores.

Suddenly, I was spending every day drawing rows of shelving, coolers, and video rental counters.

Almost every store had virtually the same plan, just scaled to a different square footage, so I was basically copying the same thing over and over again.

After I'd been there about three years, Bilo Headquarters asked our firm to provide a draftsman to work at its corporate office for a few months.

Now, I spent every working hour in a dark, windowless room exclusively drawing grocery stores.
The rest of this transcript — segmented and speaker-labeled, so you land on the exact moment something was said
Search every transcript — by keyword, by phrase, or by meaning, across every show Radar indexes
Trends — what is surging across podcasts, measured against its own baseline
Alerts — when a name you follow appears in a newly indexed episode
No account is needed to search Radar.