Jun 24, 2026 · 11 min · 13 segments
While many Buckeyes head home for the summer, Ohio State’s campus enters one of its busiest seasons for improvement and renewal. From major roadway and infrastructure projects to behind-the-scenes…
Pete CalamariGuest
Brooke BartholomewHostTom EkergrenGuestCan you walk us through some of the work currently underway and what these projects will accomplish for campus?
Everything from renovating utility tunnels to upgrading domestic water lines, sanitary sewers, and roadways.
On interior projects, we're replacing plumbing systems, electrical switchgear, and roofing.
At the end of the day, all of this work is about improving the reliability and resiliency of campus.
We really take advantage of the summer months to tackle projects that have the biggest impact while fewer students are on campus.
And Pete, inside buildings work is happening that many people might never see, but it's equally as important as the projects that are visible as people walk across campus.
So what are some examples of the behind the scenes improvements taking place this summer?

But a big point of focus, particularly in the summer, is what's happening in the winter, right? So we're trying to think one season ahead.

So this is our window to fix all our heating problems from last year and get ahead for projects of the upcoming cycle.

Then there's a lot of public space refresh, things like painting, finish work, carpentry, flooring.

And there's a ton of that kind of work going on all across campus, maybe 12 to 15 buildings.

And then our HVAC staff are out very actively, not only addressing the issues that come up over the course of a warm summer, but trying to make upgrades for the spring and the fall when students come back to campus.
Can you walk us through some of the work currently underway and what these projects will accomplish for campus?
Everything from renovating utility tunnels to upgrading domestic water lines, sanitary sewers, and roadways.
On interior projects, we're replacing plumbing systems, electrical switchgear, and roofing.
At the end of the day, all of this work is about improving the reliability and resiliency of campus.
We really take advantage of the summer months to tackle projects that have the biggest impact while fewer students are on campus.
And Pete, inside buildings work is happening that many people might never see, but it's equally as important as the projects that are visible as people walk across campus.
So what are some examples of the behind the scenes improvements taking place this summer?

But a big point of focus, particularly in the summer, is what's happening in the winter, right? So we're trying to think one season ahead.

So this is our window to fix all our heating problems from last year and get ahead for projects of the upcoming cycle.

Then there's a lot of public space refresh, things like painting, finish work, carpentry, flooring.

And there's a ton of that kind of work going on all across campus, maybe 12 to 15 buildings.

And then our HVAC staff are out very actively, not only addressing the issues that come up over the course of a warm summer, but trying to make upgrades for the spring and the fall when students come back to campus.
The rest of this transcript — segmented and speaker-labeled, so you land on the exact moment something was said
Search every transcript — by keyword, by phrase, or by meaning, across every show Radar indexes
Trends — what is surging across podcasts, measured against its own baseline
Alerts — when a name you follow appears in a newly indexed episode
No account is needed to search Radar.