R
Russ LeBlanc
Electrical Code consultant and trainer ("The Code Guy"), owner of LeBlanc Consulting Services and NEC columnist for EC&M Magazine.
3
APPEARANCES
1
PODCASTS
012
DEC 30
JAN 6
JAN 13
JAN 20
JAN 27
FEB 3
FEB 10
FEB 17
FEB 24
MAR 3
MAR 10
MAR 17
MAR 24
MAR 31
APR 7
APR 14
APR 21
APR 28
MAY 5
MAY 12
MAY 19
MAY 26
JUN 2
JUN 9
JUN 16
JUN 23
JUN 30
JUL 7
JUL 14
JUL 21
JUL 28
AUG 4
AUG 11
AUG 18
AUG 25
SEP 1
SEP 8
SEP 15
SEP 22
SEP 29
OCT 6
OCT 13
OCT 20
OCT 27
NOV 3
NOV 10
NOV 17
NOV 24
DEC 1
DEC 8
DEC 15
DEC 22
DEC 29
JAN 5
JAN 12
JAN 19
JAN 26
FEB 2
FEB 9
FEB 16
FEB 23
MAR 2
MAR 9
MAR 16
MAR 23
MAR 30
APR 6
APR 13
APR 20
APR 27
MAY 4
MAY 11
MAY 18
MAY 25
JUN 1
JUN 8
JUN 15
JUN 22
JUN 29
JUL 6
JUL 13
JUL 20
JUL 27
AUG 3
AUG 10
AUG 17
AUG 24
AUG 31
SEP 7
SEP 14
SEP 21
SEP 28
OCT 5
OCT 12
OCT 19
OCT 26
NOV 2
NOV 9
NOV 16
NOV 23
Nov 2, 2026
Breaking Down the New GFPE Performance Testing Requirement in the 2026 NEC
2:11
8:06

Ellen ParsonHOST
If you could go over what the new requirement is, what does Section 555.35 introduce for GFPE protection systems? And what do you think the intent is behind this particular change?
R
2:25Russ LeBlancGUEST
Well, there were actually several changes in 555.35. One is the addition of the word peers to cover installations that might not quite meet the definition of docking facilities.
R
2:38Russ LeBlancGUEST
And 555.35a was revised to require feeders and branch circuits to be protected by listed facilities.
R
2:51Russ LeBlancGUEST
And that particular revision brings back the language that was inadvertently omitted for 2023.
R
2:58Russ LeBlancGUEST
The 2023 required GFPE protection rated 30 milliamps for shore power receptacles and GSI protection for other receptacles installed on branch circuits, but did not require GFPE protection for the entire branch circuit.
R
3:16Russ LeBlancGUEST
555.35b was added to address ground fault monitoring of fire pumps, and 555.35f was also added to require performance testing of the GFPE systems.

Ellen ParsonHOST
What might that process involve and what is the electricians, you know, ultimately trying to verify here? And is that a change from the previous code or is that new with this code or was it always like that?
Important NEC Updates Involving Receptacles Used for EV Charging Equipment
6:00
8:05

Ellen ParsonHOST
So what does that listing tell the electrician, for example, about how that receptacle has been designed and tested? So.
R
6:10Russ LeBlancGUEST
And honestly, I don't quite know how to answer that because unless the product safety standard for receptacles has somehow changed overnight, the product standard for receptacles, which is UL489, does not have any specific information about such a listing.
R
6:28Russ LeBlancGUEST
Perhaps the correct terminology to use here would have been identified for EVSE and WPTE use rather than listed for EVSE and WPTE use.
R
6:43Russ LeBlancGUEST
Identified means recognizable as suitable for the use, but does not necessarily mean it has been tested by a testing lab.
R
6:52Russ LeBlancGUEST
like UL or ETL, for example, I know that there are several manufacturers that produce receptacles that are specifically designed or identified for EVSE and WPTE use, but not listed for that use.

Ellen ParsonHOST
Any advice on, you know, just for our listeners in general, what should contractors, electricians know about existing installations they might be working on where a standard grade receptacle is already being used for EV charging? And then, you know, are there any warning signs of overheating or connection problems they should be looking out for?
R
8:24Russ LeBlancGUEST
Well, if they are concerned, they should inspect the receptacle and the attachment plug regularly.
New NEC Rules Regarding Power Control Systems (PCS)
5:00
7:13

Ellen ParsonHOST
Could you go into a practical example, maybe, of how the listeners would encounter this type of situation in the field?
R
5:11Russ LeBlancGUEST
So for this example, we're going to use an all-electric house, including electric heat, an electric dryer, an electric range, and all electric appliances.
R
5:22Russ LeBlancGUEST
The service for the house is rated 200 amps, and the customer wants to add an EV charger.
R
5:28Russ LeBlancGUEST
But that EV charger could potentially cause that 200-amp service to be overloaded.
R
5:33Russ LeBlancGUEST
So instead of upgrading to a larger service, the electrician could install one of these power control systems to control the loads and prevent that service from drawing more than 160 amps.
R
5:46Russ LeBlancGUEST
That's that 80% limit of 200 amp service, right? And so with the PCS installed, for example, the EV charging equipment would only be energized when the total load on the service would not exceed 160 amps.

Ellen ParsonHOST
So when the code specifically references using these PCS in load calculations, does it change or affect the way electricians and engineers would approach, you know, sizing demand and demand calculations? And if so, how?