
Bob Pyke
Dr. Bob Pyke (Robert Pyke) is a consulting geotechnical and earthquake engineer based in Walnut Creek, California, who has worked independently since 1977 on dams, seismic upgrades, port facilities, and the Millennium Tower remediation in San Francisco.
4
APPEARANCES
1
PODCASTS
012
DEC 30
JAN 6
JAN 13
JAN 20
JAN 27
FEB 3
FEB 10
FEB 17
FEB 24
MAR 3
MAR 10
MAR 17
MAR 24
MAR 31
APR 7
APR 14
APR 21
APR 28
MAY 5
MAY 12
MAY 19
MAY 26
JUN 2
JUN 9
JUN 16
JUN 23
JUN 30
JUL 7
JUL 14
JUL 21
JUL 28
AUG 4
AUG 11
AUG 18
AUG 25
SEP 1
SEP 8
SEP 15
SEP 22
SEP 29
OCT 6
OCT 13
OCT 20
OCT 27
NOV 3
NOV 10
NOV 17
NOV 24
DEC 1
DEC 8
DEC 15
DEC 22
DEC 29
JAN 5
JAN 12
JAN 19
JAN 26
FEB 2
FEB 9
FEB 16
FEB 23
MAR 2
MAR 9
MAR 16
MAR 23
MAR 30
APR 6
APR 13
APR 20
APR 27
MAY 4
MAY 11
MAY 18
MAY 25
JUN 1
JUN 8
JUN 15
JUN 22
JUN 29
JUL 6
JUL 13
JUL 20
JUL 27
AUG 3
AUG 10
AUG 17
AUG 24
AUG 31
SEP 7
SEP 14
SEP 21
Jul 30, 2026
Episode 209: a conversation with Bob Pyke (part 4 of 4)
17:32
17:59
18:14

Bob PykeGUEST
Reason that's important is that my double shaking table test just extended what Jeff Martin had already found, which is that as you accumulate cycles of loading, whether they're regular or irregular, there's a hardening effect on the modulus and a decrease in the amount of settlement.

Bob PykeGUEST
So you have to track the effect of the stress and strain history as you work through, uh, the input time history, and ideally, you track both.

Bob PykeGUEST
Um, uh, and the result is, uh, you tend to accumulate settlement faster- But because you are sh- you have faster accumulation of settlement and the addition slows down as you get more settlement, because the way Jeff Martin and I reduced the data, the settlement per cycle is a function of settlement up to that point.
12 MINS LATER
Episode 208: a conversation with Bob Pyke (part 3 of 4)
11:48
12:02
12:13

Bob PykeGUEST
And so as a resident of California, uh, we're, we're used to hearing about California water, uh, policy and politics, which I got more involved in at one point.

Bob PykeGUEST
Uh, but it's all about- Shasta Dam, Oroville Dam, and transport- Yeah ... of water to- Yeah ...

Bob PykeGUEST
It's not about- Yeah ... uh, flood control for Los Angeles, which is still a very important issue.
18 MINS LATER
Episode 206: a conversation with Bob Pyke (part 2 of 4)
5:20
5:28
5:55
6:23

Bob PykeGUEST
Uh, but relative to what we're heading towards, there are, there are four more recent articles.

Bob PykeGUEST
And I, I just have to mention that, that in that writing about slope stability analysis and, uh, tailings dams failures, I came to the conclusion that we shouldn't be talking about slope stability analysis anymore.

Bob PykeGUEST
Um, conventional slope stability analyses, like the simplified method for evaluating liquefaction potential- Which I so admired when it was first published by Seed and Iversen when I first- Yeah ... heard Harry Seed present it, is sort of out of date.

Bob PykeGUEST
Just like conventional limit equilibrium slope stability analyses are fine, but they're really only use- useful when there is no problem.
29 MINS LATER
Episode 205: a conversation with Bob Pyke (Part 1 of 4)
24:38
25:05
26:05
26:41

Bob PykeGUEST
and so uh When it came time to retire from PG&E, he became the leading consultant worldwide on how to properly build rock fill embankments with or without earth cores or some other impermeable membrane on them.

Bob PykeGUEST
And off the top of his head, he could design an earth and rock fill dam and say you know you want to go with a fairly thin but not too thin earth core have two filter zones downstream one filter zone upstream you can pack the rock fill the inside of it in six foot lifts and then the outside of it in three foot lifts and then have rip rap on downstream face and the top of the upstream face and um if you can find good rock then you can build this with one to 1.8 uh outside slopes upstream and downstream and so literally he designed the dam in in one afternoon.

Bob PykeGUEST
But while they had a very good geologist who came from the Australian equivalent of the Bureau of Mines and was seconded to the department, who was already working on the job, they didn't have anyone in that group who knew anything about soils or basically even knew how to go about looking for an appropriate borough area for soils.

Bob PykeGUEST
Neither did I, but I was willing to have a crack at it and somewhat eager to get out of structural engineering design.
5 MINS LATER