This is the life for which the field must really be designed. Development planning and construction may occupy five or six years, but the facilities can operate for twenty-five years or more. Over…
Geoff ParkHostNo entities detected.

Far offshore, long after the construction barges have departed and the project team has moved on, an installation settles into its real life.

In the control room, screens trace pressures, temperatures and flow rates through a process that never quite stands still.

None of these changes is dramatic on its own, but an operator has to notice them, understand what they mean, and decide what to do before a small deviation becomes lost production, damaged equipment, or a threat to safety.

Development planning and construction may occupy five or six years, but the facilities can operate for 25 years or more.

Over that period, the undiscounted cost of operating and maintaining them may exceed the original capital investment.

A design that looks efficient on the project schedule can therefore become an expensive burden if it's difficult to operate, hard to inspect, or dependent on equipment that can't be maintained without shutting down production.

It's about how frontline staff operate the assets safely, reliably and economically as the reservoir declines, the fluid mix changes and the equipment ages.

I'm Geoff Park and this is From Basin to Balance Sheet, the integrated story of how a geological possibility becomes an investment, a producing asset and eventually a retirement obligation.
Read the full transcript.
Create an account to read the whole episode, search across every transcript, and follow the shows you care about.

Far offshore, long after the construction barges have departed and the project team has moved on, an installation settles into its real life.

In the control room, screens trace pressures, temperatures and flow rates through a process that never quite stands still.

None of these changes is dramatic on its own, but an operator has to notice them, understand what they mean, and decide what to do before a small deviation becomes lost production, damaged equipment, or a threat to safety.

Development planning and construction may occupy five or six years, but the facilities can operate for 25 years or more.

Over that period, the undiscounted cost of operating and maintaining them may exceed the original capital investment.

A design that looks efficient on the project schedule can therefore become an expensive burden if it's difficult to operate, hard to inspect, or dependent on equipment that can't be maintained without shutting down production.

It's about how frontline staff operate the assets safely, reliably and economically as the reservoir declines, the fluid mix changes and the equipment ages.

I'm Geoff Park and this is From Basin to Balance Sheet, the integrated story of how a geological possibility becomes an investment, a producing asset and eventually a retirement obligation.