ZESCO
Electricity generation companyWikipedia
7
MENTIONS
6
EPISODES
4
PODCASTS
Search complete. 7 mentions across 6 episodes found for "ZESCO".
Oct 7, 2026
[FULL SHOW] Energy procurement, WhatsApp scams, and offshore investment changes
H
29:07Hosein SuramahopaGUEST
So we are working with some of our financing houses here, the DBSA, IDC, South African Power Pool, to ensure that we build that capacity capacity to improve the regional interconnectors.
H
29:22Hosein SuramahopaGUEST
On the other side of the interconnector, we have a buyer and most of those buyers facilitated through Zesco in this instance are the mines.
H
29:30Hosein SuramahopaGUEST
How do they produce now? They are relying on diesel.
H
29:33Hosein SuramahopaGUEST
They burn diesel.
Government unveils new electricity procurement plan
K
9:31Kgosientsho RamokgopaGUEST
We are connected as a region, but the capacity is not sufficient, so we are working with some of our find funding, financing houses here, uh, the DBSA, IDCs, South African Power Pool, to ensure that we build that ca- um, uh, capacity to improve the regional interconnectors.
K
9:49Kgosientsho RamokgopaGUEST
On the other side of the interconnector, we have a buyer, and most of those buyers facilitated through ZESCO in this instance are the mines.
K
9:57Kgosientsho RamokgopaGUEST
How do they produce now? They are relying on diesel.
K
10:00Kgosientsho RamokgopaGUEST
They burn diesel.
African Real Assets: What Becomes Investable Over 30 Years? – Mwiya Musokotwane
M
19:20Mwiya MusokotwaneGUEST
So basically, the grid is now available to any IPP or trader to utilize.
M
19:29Mwiya MusokotwaneGUEST
It's still owned by the national utility, the transmission infrastructure, the core transmission infrastructure is owned by Zesco.
M
19:38Mwiya MusokotwaneGUEST
But because we're in this environment where there's been a deficit of power generation, that infrastructure at a fee.
M
19:45Mwiya MusokotwaneGUEST
So a wheeling cost is available to any producer of power that has a customer who's demanding that power.
CHANGES AT ZAMBIA POLICE
E
69:42Emmanuel MwambaHOST
Yeah.
E
69:43Emmanuel MwambaHOST
Before you blame El Niño, blame everything that happens with the mismanagement of ZESCO.
E
69:51Emmanuel MwambaHOST
Brian, your comments.
B
69:55Brian MatamboGUEST
Ambassador, once again, the cholera issue, uh, for me, it, it means that, um, government is really, really failing to, to, to, to keep its own promises.
EMV BREAKFAST SHOW ON CATHOLIC PASTORAL CITY
E
17:05Emmanuel MwambaHOST
Load shedding is likely going to come.
E
17:07Emmanuel MwambaHOST
Power exports will probably be reinstated or have been reinstated because we saw so many notices from Zesco alleging that there'll be no power in Makeni.
E
17:19Emmanuel MwambaHOST
I received so many notifications, you know, or there'll be no power in Kafiwe because Zesco is undertaking routine maintenance.
E
17:29Emmanuel MwambaHOST
Remember that's how they were load shedding us until the matter went to Parliament and the Minister of Energy was forced to admit that Zambia had a power shortage and the commitments for power exports required that there should be load management and Zambia then went on to suffer load shedding for a period of six years.
E
17:51Emmanuel MwambaHOST
The elections are over.
A4D EP 78 | Zambia 2026 Election Recap: Free & Fair Elections?
S
17:48Simon MwilaGUEST
Wow.
S
17:49Simon MwilaGUEST
The Zesco employees know this.
S
17:51Simon MwilaGUEST
They don't.
S
17:52Simon MwilaGUEST
Wow.