Central Maine Power built it when Maine deregulated in the late 90s.
Jeff ThalerMODERATOR
46:33
That was one of the generation assets that Florida Power and Light won through an RFP process where they acquired all of the CMP's dams, the Wyman Station project in Yarmouth, and Mason Station small facility in Wiscasset.
Jeff ThalerMODERATOR
46:51
There's about 800 megawatts of transmission capacity from Wyman, mostly unused Wyman, has what you were referencing as a four capacity market contract with ISO New England that they sort of bid in every couple years, and I think they have some more years left.
Jeff ThalerMODERATOR
47:08
My recollection of that DEP application they submitted was that they would shut down two of the units.
Jeff ThalerMODERATOR
47:59
One was a coal gasification plant, one was a pump storage facility that was going to be dug into the river there, and then also potentially an offshore wind cable going up the Sheepskate River and connecting there.
Jeff ThalerMODERATOR
48:12
So, but that I think Melissa mentioned Surowiec.
Jeff ThalerMODERATOR
48:17
Surowiec's in North Yarmouth where there is a constriction currently so and substantial load going into Wiscasset currently would have to deal with that to get out but Wyman Station is south of that just for whatever it's worth.
Jeff ThalerMODERATOR
48:33
So we do have a lot of unused capacity Rick you would probably know that well as well.