Skip to main content
Snowy 2.0 Pumped Storage Power Station

Snowy 2.0 Pumped Storage Power Station

Search complete. 49 mentions across 26 episodes found for "Snowy 2.0 Pumped Storage Power Station".

Oct 16, 2026

Adam CreightonGUEST
32:23
...
Adam CreightonGUEST
32:24
there to be saved on Snowy 2.0, on net zero, on various infrastructure boondoggles.
Adam CreightonGUEST
32:29
So yeah, yeah, certainly there's, there's, there's lots to be done.
Adam CreightonGUEST
32:31
But the point I'm just trying to make is that when the government proposes little things, just let's just, let's just go along with it 'cause at least, at least it's reduci- [chuckles] reducing spending a little bit.
Chris SmithHOST
67:35
It's calling for a full independent audit of government energy spending.
Chris SmithHOST
67:42
pointing to cost blowouts at Snowy 2.0 in Hulme Link and an expanded home battery subsidy and billions in support for struggling industries.
Chris SmithHOST
67:51
The argument is that taxpayers deserve to know what's been spent, which is fair enough.
Chris SmithHOST
67:57
What's still to come? How much more are you going to spend, Chris Bowen, on this transition? And whether the projects are delivering affordable, reliable electricity and the promised emissions cuts, or is it just inefficient? And if it is inefficient, why the hell are we going down this track? It also argues nuclear power should be taken off the table as a forbidden option and properly assessed alongside alternatives.
Claire HarveyHOST
0:29
That story's live now at theaustralian.com.au.
Claire HarveyHOST
0:34
Snowy 2.0 was supposed to be the world's biggest battery, the renewable energy dream made real right here in Australia.
Claire HarveyHOST
0:43
But a decade of catastrophic delays and blowouts have the whole project literally at risk of getting squeezed to death by Australia's ancient geology.
Claire HarveyHOST
0:53
And now The Australian's revealing the Commonwealth Government considered sacking the builder that was meant to save this enormous project.
Perry WilliamsGUEST
2:13
[laughs] Yeah, we've all watched our fair share of grand design shows.
Perry WilliamsGUEST
2:16
We know the moment that's coming.
Perry WilliamsGUEST
2:18
Look, Snowy 2.0, this is on a grand scale, and what's happened is it is some of the most challenging geological conditions, mostly because it's not all the same.
Perry WilliamsGUEST
2:30
So as you kinda move through, you know, the different rock types, the different terrain, it's required slight tweaks to these massive tunnel boring machines.
Chris SmithHOST
52:36
R-E-L-I-A-B-L-E, the word that Chris Bowen can't spell.
Chris SmithHOST
52:42
Firstly, Snowy 2.0, the massive pumped hydro project designed to help back up renewable energy.
Chris SmithHOST
52:49
The government-owned operator and its Italian contractor are now trading blame over soaring costs and missed deadlines.
Chris SmithHOST
52:58
WeBuild points to difficult geology, design changes and rising construction costs, while Snowy Hydro says contractor productivity has also contributed.
Kyle MorrisonHOST
15:01
But what project are you talking about?
Justin LawmanHOST
15:03
Oh, the snowy, the snowy scheme down here, Snowy 2.0.
Kyle MorrisonHOST
15:07
So it wasn't like a job they said, "We'll do the job for five million." They just said, "Do the job, and we'll just give you 20% on top."
Justin LawmanHOST
15:14
We'll give you a dollar 20 for every dollar you spend.
AdamHOST
15:32
Yeah
Aaron WittHOST
15:32
... allow me to spice things up even further, because from Gladstone we flew to Canberra, which is Australia's capital city, and then we drove another few hours into the gorgeous Snowy Mountains to visit the largest hydropower project in the Southern Hemisphere called Snowy 2.0. And think of Snowy 2.0 as the one of the world's biggest batteries.
AdamHOST
15:58
Mm-hmm.
Aaron WittHOST
15:59
The problem or challenge with renewable energy, like solar, is that it doesn't have anywhere to go during low demand hours.
Aaron WittHOST
16:42
Or gas, you put it in a pipeline or, uh, et cetera.
AdamHOST
16:45
Mm-hmm.
Aaron WittHOST
16:46
Uh, so that's one of the big challenges with renewables and, um, Snowy 2.0 addresses that challenge by allowing renewable, like solar, during low demand hours while solar is producing, um, to pump water uphill using enormous turbines.
AdamHOST
17:10
Mm.
John StanleyHOST
24:33
I think he's been given that name, that nickname, and I think it applies.
John StanleyHOST
24:37
So that's a most interesting case, and there's no reason why we can't be told what's happening with Snowy 2.0. First week of November could be very interesting.
John StanleyHOST
24:46
25 to 9 to 8 if you're in Queensland.
John StanleyHOST
24:48
22 minutes to 9 to 8 if you are in Queensland just on our feedback line a lot of people unhappy about the situation particularly with Snowy 2.0 that we're paying for it and that we're not actually being told what's happening there and just on rorts and grants and the fact that it's unconstitutional for the federal government to be handing out stuff that should be done by states and Greg makes a point here just in relation to all of this we do the census he's made this point before and it's very good one I know you're a regular correspondent here that we do the census we did it recently and the census is supposed to say what who's there what are needed what the facilities are that might be needed in a certain area and so then that information is available for decision makers to decide whether they allocate funds and councils have access to that, state governments and others, but it seems that the political colour of the area often has a greater impact.
John StanleyHOST
25:47
21 minutes to nine is the time.
John StanleyHOST
25:48
Now, I was jolted by two things this evening.
John StanleyHOST
16:19
I've, I think he's been given that, uh, name, that nickname, and I think it applies.
John StanleyHOST
16:23
So that's a most interesting case, and there's no reason why we can't be told what's happening with Snowy 2.0. First week of November could be very interesting.
Alan KohlerHOST
49:14
I think that you know we don't need to do the orcas subs and i think most of the defense spending is pretty useless particularly now that warfare is all about drones and you know cheap much more much cheaper ways of fighting each other i think um I'd do
Stephen MayneHOST
49:31
infrastructure procurement that we, you know, Snowy 2.0, North East Link, 26 billion.
Stephen MayneHOST
49:37
Governments just get done over with our industrial laws, CFMEU, et cetera.
Stephen MayneHOST
49:41
So I would demand more efficiency in the productivity of the government's infrastructure spending.
DaveHOST
34:13
Because for example, one, w- another weave, well, it's kind of a weave 'cause it's not legal.
DaveHOST
34:18
Um, but I, I want some transparency over our, our, um, Hydro 2.0, our Snowy 2.0 scheme.
DaveHOST
34:26
I wanna see who did the estimate of 2 billion cost.
DaveHOST
34:30
Who's now revised it to 40 and ongoing? Who along that journey have had oversight of what and ticked off and signed off? I, I want some, I want some transparency there because-

16 more episodes mention Snowy 2.0 Pumped Storage Power Station.

Create an account to see the whole feed, search across every transcript, and follow the entities you care about.

We value your privacy

We use cookies to understand how you use our platform and to improve your experience. Click “Accept All” to consent, or “Decline non-essential” to opt out of non-essential cookies. Read our Privacy Policy.