Oct 30, 2026
The Connected Factory: Episode 9: The Human Side of the Connected Factory
K
0:31Katherine BloughHOST
Not just technically, but intuitively, with the kind of physical familiarity that comes from daily contact with specific equipment over a long time.
K
0:41Katherine BloughHOST
When the plant deployed its new connected factory platform, real-time OEE dashboards at each work center, production pacing indicators visible to the whole floor, individual operator performance metrics available to supervisors in the management system, Maria was the person whose reaction the plant manager watched most carefully.
K
1:01Katherine BloughHOST
Because he knew that if Maria decided the new system was something to work around rather than with, the rest of the floor would follow her lead within a week.
K
1:10Katherine BloughHOST
The first three weeks were difficult.
20 MINS LATER
K
21:05Katherine BloughHOST
The most effective approaches I have seen share three characteristics.
K
21:09Katherine BloughHOST
First, they are grounded in operational scenarios rather than the system features.
K
21:14Katherine BloughHOST
Instead of, here's how the OEE dashboard works, they ask, here's a scenario where your OEE dropped last Tuesday.
K
21:21Katherine BloughHOST
What does the dashboard tell you? What does it not tell you? And what would you do? Learning to use a system in the context of decisions you actually make is dramatically more effective than learning its features in the abstract.
A Pragmatic Industrial Data Platform Roadmap for Mid-Sized Manufacturers
M
59:57Mirko PetersHOST
It depends on the definition the plant adopts, and that choice needs to be explicit.
M
60:01Mirko PetersHOST
If one team excludes changeovers and another includes them, the resulting OEE difference partly describes their calculation choices rather than a difference in how effectively their equipment produces.
M
60:10Mirko PetersHOST
You're comparing definitions, not performance.
M
60:12Mirko PetersHOST
Use an approved value applicable to the product and operation, with its effective period recorded.
M
60:24Mirko PetersHOST
When a machine runs different products during the period, calculate expected production time using the applicable reference for each product before combining the results for the measure.
M
60:33Mirko PetersHOST
One average cycle time won't capture the real variation.
M
60:36Mirko PetersHOST
For an OEE measure based on first pass good output, a piece needing rework doesn't count as good on its initial pass, even if the plant later accepts it.
M
60:44Mirko PetersHOST
The rule needs to be written down and consistently applied.
Alissa Daly of Grantek - The Industry 4.0 Podcast with Grantek
A
51:21Alissa DalyGUEST
But plenty of clients are starting at the assessments and kind of roadmap phase.
A
51:27Alissa DalyGUEST
Plenty of clients are starting with the implementation side of things, taking a look at one line, one OEE pilot, and that's a perfectly good place to start as well.
M
51:38Matt SoucyHOST
Good perspective.
M
51:39Matt SoucyHOST
Really kind of gives the full gauntlet of what we're trying to do here.
OEE Is a Smoke Detector, Not a Scoreboard: ProFood World
C
0:22Casey FlanaganNARRATOR
Hi, I'm Casey Flanagan, Associate Editor with ProFoodWorld.
C
0:25Casey FlanaganNARRATOR
This AI generated podcast episode covers how food and beverage manufacturers can turn overall equipment effectiveness or OEE from a passive scoreboard into an active driver of plant performance.
C
0:36Casey FlanaganNARRATOR
It highlights how establishing honest baselines, breaking losses into availability, performance and quality, and using digital tools for real time coaching can shift operations toward continuous improvement.
S
0:48speaker_2HOST
What if I told you the manufacturing metric that your plant floor is completely obsessing over is actually destroying your productivity?
S
0:55speaker_3HOST
Yeah, that's a tough pill to swallow, but it is happening everywhere.
S
0:58speaker_2HOST
So in this deep dive, we're going to explore how digital tools can actually transform overall equipment effectiveness or OEE.
S
1:06speaker_3HOST
Yeah, moving it from just a static recording scoreboard into an active real-time driver of plant performance.
S
1:13speaker_2HOST
Exactly.
15 | How Kumaran Thillainadarajah built SmartSkin Technologies
S
16:24speaker_0HOST
Where was damage happening in a bottling process? SmartSkin provided the answer.
K
16:32Kumaran ThillainadarajahGUEST
Before SmartSkin, plants measured the output, OEE, speed of line, container damage, but they never knew what was causing those numbers.
K
16:49Kumaran ThillainadarajahGUEST
We help them measure container handling.
K
16:52Kumaran ThillainadarajahGUEST
The initial concept was that we could reduce glass breakage, but reducing glass breakage is the very tip of the iceberg.
K
16:59Kumaran ThillainadarajahGUEST
It's one application for our technology.
K
17:02Kumaran ThillainadarajahGUEST
Really, what we do is we help plants understand container handling, which is something that they were never able to do before.
K
17:10Kumaran ThillainadarajahGUEST
So plants measure OEE, which is operational efficiency, But that's the output of all these other factors.
K
17:22Kumaran ThillainadarajahGUEST
So they never understood why their OEE was down or what was causing them to damage their
Scaling without losing your DNA with Colin Denihan
C
18:51Colin DenihanGUEST
No, when I say autonomy, they have accountability for their P&L.
C
18:55Colin DenihanGUEST
They have accountability for the OEE numbers.
C
18:57Colin DenihanGUEST
They have accountability for their quality and accountability on their gross margin.
C
19:00Colin DenihanGUEST
They are still getting the support from our home corporate office.
140. Buying a Machine Shop: Due Diligence, Systems, and the First Four Years with Fairchild Parts
K
40:20Kirsten FailingGUEST
Just really settling in with that and then taking a bead and letting it work for a while.
K
40:26Kirsten FailingGUEST
The second one to me is OEE.
K
40:29Kirsten FailingGUEST
So we've tackled several foundational items like our quality rate.
K
40:34Kirsten FailingGUEST
We did a big project a couple of years ago where we went from like 85% first pass yield and now we're at 96%, which with tight tolerances, we're very proud of.
Before You Set Goals, Answer Two Questions
A
12:16Aron KolosikHOST
Look at your technology, too, as part of this processes and systems.
A
12:20Aron KolosikHOST
Is my ERP system giving me what I need? Is my manufacturing excellence system or OEE tracking giving me what I need? You need to assess your processes and your systems.
A
12:33Aron KolosikHOST
Are they working and not working for you versus what you would expect? from a plant or an operation like yours.
A
12:40Aron KolosikHOST
So again, working, not working on processes and systems.
Tough Leaders Who Care with Aron Kolosik
A
34:01Aron KolosikGUEST
We made shampoo, Pantene, and Head & Shoulders back in the day.
A
34:04Aron KolosikGUEST
And they run 380, 400 bottles a minute on that line, and our job was to drive OEE.
A
34:09Aron KolosikGUEST
and i remember telling people at that time again as a young leader hey you need to have your head on a swivel like these were literally my words you need to have a head on this well you need to be looking to see where the next thing's going down and get there before it causes the line to go down but what that created was this hustle culture of like we were manhandling the results if you will and so they were they were incredibly reactive so our our time between going down and going back up it was really really short but the problem was we were still going down And when you pull off the energy or the focus, those aren't unsustainable.
A
34:42Aron KolosikGUEST
And I'm telling people to hustle and move and move faster culturally versus the opposite, which is, hey, let's focus on why are we going down and let's figure out how do we extend the length of the run so you can actually see what happened when you went down and look and observe.
Bad Machine Data: Fixing Data Quality Before It Reaches Power BI
M
48:41Mirko PetersHOST
Removing uncertain intervals can make the remaining operating period appear better than the full record supports.
M
48:45Mirko PetersHOST
This becomes particularly sensitive with overall equipment effectiveness, or OEE.
M
48:50Mirko PetersHOST
OEE combines availability, performance and quality, and each factor depends on agreed definitions of the time, output and acceptable production included in its calculation.
M
48:59Mirko PetersHOST
Availability compares operating time with planned production time.
M
49:02Mirko PetersHOST
Production needs to define which scheduled periods belong in that denominator, including how breaks, planned maintenance and other agreed exclusions affect the time against which availability gets judged.
M
49:56Mirko PetersHOST
An interruption too short for the collection method to capture can't become a reliably measured microstop simply because the reporting team chooses a threshold that includes it.
M
50:05Mirko PetersHOST
Quality also needs a defined counting basis.
M
50:08Mirko PetersHOST
For the OEE calculation, agree which output counts as total production and which output counts as acceptable production.
34 more episodes mention Overall equipment effectiveness.