eBART
Transit lineWikipedia
10
MENTIONS
1
EPISODES
1
PODCASTS
Search complete. 10 mentions across 1 episode found for "eBART".
Oct 30, 2026
[Audio] Modeling US DMUs Part 8: eBART
S
0:00speaker_0HOST
Alright, hello everybody, and welcome to Modeling U.S. DMU Transit Systems, Part 8, the East Contra Costa County BART Extension, or eBART.
S
0:09speaker_0HOST
This is Part 8 in an ongoing 12-part series describing my journey to bicycle, ride, and photograph all 10 DMU systems in the United States, so if you want, feel free to check out all of those other videos.
S
0:21speaker_0HOST
Stardate, 2018, Dateline, Northern California.
S
3:53speaker_0HOST
It is built at a different gauge from the BART trains, it forces a transfer, it has a separate and duplicative operations and maintenance facility, none of it is future-proofed for later BART extension, and then there's effectively no walkable urbanism at all around any of the stations.
S
4:07speaker_0HOST
Like, the jokes just write themselves at this point.
S
4:10speaker_0HOST
Anyway, eBART uses a fleet of eight stock-standard Stadler GTW 2.6s.
S
4:14speaker_0HOST
It was the last system in the United States to use the GTW platform, and these are very familiar numbers.
S
4:19speaker_0HOST
41 meters long, 37 metric tons, 800 horsepower, 120 kilometer per hour capable, and 104 seats onboard.