BWRX-300
7
MENTIONS
5
EPISODES
5
PODCASTS
Search complete. 7 mentions across 5 episodes found for "BWRX-300".
Sep 23, 2026
Heather Exner-Pirot: Arctic Myths, Nuclear Capital, Copper | SynMax Energy Brief
H
5:41Heather Exner-PirotGUEST
We're still talking about a lot of first-of-a-kinds.
H
5:44Heather Exner-PirotGUEST
So other than the AP1000, the GHitachi, WWRX is first-of-a-kind.
H
5:50Heather Exner-PirotGUEST
The Oklo will be a first-of-a-kind.
H
5:52Heather Exner-PirotGUEST
The X-Energy will be a first-of-a-kind.
AI demand is intensifying the race to build advanced nuclear reactors
A
5:08Abbie BennettCORRESPONDENT
How that project goes stands to dramatically shift the SMR landscape.
A
5:13Abbie BennettCORRESPONDENT
Here in the US, the Tennessee Valley Authority is exploring use of that same BWRX-300 reactor design used in the Darlington project for its own Clinch River project, and it's already secured significant federal funding, though it is in much earlier stages than Darlington.
A
5:32Abbie BennettCORRESPONDENT
So I'd say if you want to watch this space, those are two projects to definitely keep a close eye on.
D
5:39Dan TestaHOST
You recently published your annual or periodic look at the state of the advanced nuclear sector.
How Nuclear Energy Is Ensuring Europe’s Secure, Low-Carbon Future
J
55:44Justin FriedmanUNKNOWN
Um, but they are doing a fleet approach, which is exactly what Victor and, and Steve you were talking about.
J
55:50Justin FriedmanUNKNOWN
And so in Poland, um, they're doing BWRX-300 technology, and they have government approval to do 26 SMRs.
J
56:00Justin FriedmanUNKNOWN
26.
J
56:01Justin FriedmanUNKNOWN
And they're already have identified 14 that they wanna build in the first round at three different sites.
Nuclear Workforce Continuity Becomes an Execution Advantage
S
2:05speaker_0HOST
It created a mature regional workforce and supplier network.
S
2:09speaker_0HOST
OPG is now building the first of four planned GE Vernova Hitachi BWRX-300 small modular reactors at the same Darlington site, and many workers from the refurbishment have been retained for the new project.
S
2:23speaker_0HOST
Existing nuclear sites already have grid connections, roads, water infrastructure, security systems, and established regulatory relationships.
S
2:32speaker_0HOST
Darlington also has something new-build projects frequently have to assemble from scratch.
S
5:16speaker_0HOST
First-of-a-kind costs still have to come down.
S
5:20speaker_0HOST
Workforce continuity does not eliminate nuclear project uncertainty on its own.
S
5:25speaker_0HOST
The first BWRX-300 at Darlington is a first-of-its-kind commercial deployment with an estimated cost of $5.54 billion for that unit and $15.4 billion for all four reactors combined.
S
5:41speaker_0HOST
The economics of the broader program depend partly on cost reductions as later units repeat the design, and analysts caution those reductions have not yet been demonstrated commercially.
Mornings with Graeme Goodings - 4 September 2026
T
67:05Tony IrwinGUEST
They've been operating in Russia and China, and people say, well, okay, they're in Russia and China, but this is different in the West.
T
67:13Tony IrwinGUEST
Well, now the Canadian BWRX-300 is under construction in Canada on the Darlington side.
T
67:21Tony IrwinGUEST
That one's going ahead.
T
67:23Tony IrwinGUEST
And Rolls-Royce in the UK, who supply all the UK nuclear power submarine reactors, They've got a small modular reactor, and that's being built in the UK now.