Skip to main content
Newport News Shipbuilding

Newport News Shipbuilding

Ship builderWikipedia

Search complete. 13 mentions across 10 episodes found for "Newport News Shipbuilding".

Sep 9, 2026

Steve WaddellGUEST
1:10
It really is a leap when you jump off.
Steve WaddellGUEST
1:12
I spent 25 years building nuclear-powered aircraft carriers at Newport News Shipbuilding.
Steve WaddellGUEST
1:17
And then I left and joined my wife's woman-owned small business, Reed Integration, Inc., and helped her grow it to a multimillion-dollar government consulting business.
Steve WaddellGUEST
1:27
She's doing really well, by the way.
Chuck PfarrerGUEST
71:55
all of the blue water soviet navy was built in the mykolaiv shipyard in in ukraine and i'm not just talking about people who actually could weld i'm talking about naval architects i'm talking about the 800 pound brains that know how to design blue water guided missile cruisers okay What's it also take to make a Blue Water Navy? It takes hundreds of billions of dollars, right? It takes skilled shipyards.
Chuck PfarrerGUEST
72:28
It takes an economic system that can produce that surplus at a government level, get those funds more or less intact into some place like Newport News Shipbuilding.
Chuck PfarrerGUEST
72:41
where all of that money is going to go into building an aircraft carrier.
Chuck PfarrerGUEST
72:46
And all we need to do is look at the Admiral Kustinov, that fire trap that they've already put $2 billion into, and it doesn't even float.
TowerHOST
1:51
The limiting factor is not propulsion, it's the crew.
TowerHOST
1:54
Abraham Lincoln was laid down at Newport News Shipbuilding in Virginia in November of 1984, launched in February of 1988, and commissioned in November of 1989, named for the 16th president over her service life.
TowerHOST
2:07
She has deployed to the Persian Gulf multiple times, operated extensively in the Pacific, and in May of 2003 became the backdrop for one of the more photographed political moments of the post-September 11th era.
TowerHOST
2:18
That was the mission accomplished speech.
Kirk WaldronGUEST
57:43
This was really, really frustrating.
Kirk WaldronGUEST
57:44
So when 9-11 happened, I was in Newport News Shipbuilding building the USS Ronald Reagan.
Kirk WaldronGUEST
57:50
Brand new carrier.
Kirk WaldronGUEST
57:50
We were still building it.
MargotHOST
11:22
At the time of his death, he was assigned to the ship's in-port security office, a collateral duty that required additional weapons training and authorized sailors from other ratings to stand armed security watches while the carrier remained in port.
MargotHOST
11:36
Although the Kennedy has not yet been commissioned into the fleet, the ship is in the final stages of construction at Newport News Shipbuilding and is expected to be delivered to the Navy in 2027.
MargotHOST
11:48
But while this pre-commissioning unit should not have been the scene of a homicide, everything changed during the early morning hours of June 6, 2026.
MargotHOST
11:59
At approximately 5.15 a.m. that morning, emergency personnel responded to a report of a firearm incident aboard the Kennedy.
Elaine LuriaGUEST
42:28
I think it's a disgrace.
Elaine LuriaGUEST
42:30
Um, I was actually at Newport News Shipbuilding when they did the first weld, uh, on the hull, uh, which is sort of a ceremonial, um, naming of the ship and, and starting off the construction for the Dorie Miller, and I think it was really a great, you know, moment of, of pride to represent the people who served in our military, especially in a time when they didn't have the same opportunities as everyone else in the military, were not really recognized in the same way for their service, and Dorie Miller was heroic.
Elaine LuriaGUEST
42:56
Um, he, you know, risked his own life after the attack on Pearl Harbor.
Elaine LuriaGUEST
43:00
He saved other people.
speaker_8SOUNDBITE_SPEAKER
6:25
That job took thousands of men, more nearly 5,000 workers on the ship itself from 40 different trades to meet her production schedule
Matt BevanHOST
6:34
As the Forrestal took shape in Newport News Shipbuilding company's Dry Dock 11, some slightly unexpected features were installed
speaker_8SOUNDBITE_SPEAKER
6:43
Through access openings left clear in the hull, her powerful steam turbines and reduction gears were lowered, the giant boilers too, eight of them
Matt BevanHOST
6:53
Back in the 1950s, big new cargo ships were usually built with diesel engines, but this enormous modern Navy ship was being built with a more powerful but much less efficient oil powered steam engine.
Matt BevanHOST
11:43
Sadly, this wasn't an isolated incident.
Matt BevanHOST
11:46
Around the same time two more fires were sparked by similar technical issues on two other ships and more sailors were killed.
Matt BevanHOST
11:55
Something clearly needed to change, so when it was time for the team at the Newport News Shipbuilding company to build the next generation of aircraft carriers, significant changes were made to improve the safety of the crew
speaker_9SOUNDBITE_SPEAKER
12:07
The world's largest most expensive warship, USS Nimitz, a brand new billion dollar giant slipping powerfully across the North Sea
Gabe MurphyGUEST
14:39
They're conventionally powered.
Gabe MurphyGUEST
14:41
Those shipyards aren't certified to build nuclear-powered ships, so the final assembly would take place at Newport News Shipbuilding.
Gabe MurphyGUEST
14:48
Now, if that sounds familiar, it's because that's where they're also building the Ford-class carrier, as well as some of the subs.
Gabe MurphyGUEST
14:55
As CBO put it, quote, Newport News Shipbuilding is behind schedule on constructing three aircraft carriers as well as many submarines.
Gabe MurphyGUEST
15:03
Adding the final assembly of a nuclear-powered battleship to the shipyard's workload could lengthen the delays for those programs in addition to delaying the construction of the battleship itself, end quote.
Gabe MurphyGUEST
15:15
At the end of the day, they can build this if they want to, but not without increasing costs and delaying shipbuilding across Navy programs.
Chris KavasHOST
3:26
Questions and concerns continue to swirl around President Trump's announced intention to redesign the aircraft carrier Doris Miller's CVN-81 to install steam catapults, hydraulic weapons elevators, and reposition and rework the ship's island superstructure.
Chris KavasHOST
3:42
As reported in May, the ship, under construction at HII's Newport News Shipbuilding, already is behind schedule, with the Navy revealing earlier this year that the ship's planned delivery date of February 2032 now is February 2034, resulting in an overall construction time of 15 years.
Chris KavasHOST
4:02
A major redesign, which by some estimates would cost at least $10 billion and involve years of delay, will push that completion date much further into the future.
Chris KavasHOST
4:13
As of August 21st, multiple media outlets also are reporting the Navy is considering renaming the ship, perhaps for President Trump.
Chris KavasHOST
1:04
This Week.
Chris KavasHOST
1:05
President Trump on August 13th issued a National Security Presidential Memorandum that sets out several initiatives, including development of a plan to replace the aircraft launch system and weapons elevators on the new aircraft carrier Doris Miller CVN-81, now under construction at HII's Newport News Shipbuilding.
Chris KavasHOST
1:26
The directive does not affect systems already installed on the carriers Gerald R. Ford, John F. Kennedy or Enterprise.
Chris KavasHOST
1:34
Trump has long stated his objection to the Electromagnetic Aircraft Launch System, or EMALS, installed on those carriers, as well as to the advanced weapons elevators on those ships.

We value your privacy

We use cookies to understand how you use our platform and to improve your experience. Click “Accept All” to consent, or “Decline non-essential” to opt out of non-essential cookies. Read our Privacy Policy.