Skip to main content
Florida Gas Transmission

Florida Gas Transmission

CorporationWikipedia

Search complete. 2 mentions across 2 episodes found for "Florida Gas Transmission".

Oct 9, 2026

Zaria HollimanHOST
2:18
The high-stakes matchup comes as both candidates battle for the open seat ahead of the November election.
Zaria HollimanHOST
2:24
Here in Florida, SpaceX is teaming up with Florida Gas Transmission to build a 32-mile natural gas pipeline in Brevard County.
Zaria HollimanHOST
2:32
The project will supply propellant directly for Starship launches at Cape Canaveral, cutting out hundreds of fuel trucks per launch, and paving the way for a much faster launch schedule by August 2027.
Zaria HollimanHOST
2:44
I'm Zaria Holloman, and this is Radio Network News.
ZacHOST
8:13
All right, it's time for some SpaceX news.
ZacHOST
8:15
[upbeat music] SpaceX's subsidiary called Coastal Connect Services filed in September to build a 32.4 mile 16-inch natural gas pipeline in Brevard County, Florida, connecting to Florida Gas Transmission for methane supply to Starship launches at Cape Canaveral.
ZacHOST
8:32
This would replace hundreds of LNG truck deliveries per launch, enabling safer, more efficient, and continuous fuel supply as Starship operations scale up alongside the high Falcon launch cadence from Florida.
JesseHOST
8:42
This is just like the eight-mile-

We value your privacy

We use cookies to understand how you use our platform and to improve your experience. Click “Accept All” to consent, or “Decline non-essential” to opt out of non-essential cookies. Read our Privacy Policy.